ADRIAN CASTILLO
Prosci Certified
Change Manager
SCPO, SCPM, SDRM
Adrian_i_Castillo@outlook.com
415-722-9278
SUMMARY
With 15+ years of Enterprise Controls and
Program Management experience I seek a Sr. Program Manager or Sr. Project
Manager position where I can establish Enterprise Controls, Program
Governance Structures, Change Management transformation and develop an
integrated team with coach based leadership skills towards a supported
organizational decision making framework. Leveraging my consulting experience
in a variety of industries to include Construction, Healthcare, Energy,
Transportation, and Finance I am always seeking business environments that
require creative problem solving and customization of organization based on
unique needs. Utilizing methodology to integrate and organize complex
programs ranging from $ 10 Million to 1.2 Billion ( 500+ Resources) I am
excited to establish efficiencies and execution to highly complex programs /
projects.
TECHNICAL SKILLS:
· Proficient in Windows, Primavera P6 8.0 to 8.4, Primavera
P3, SureTrack, MS Project 2003 and 2007 w/ Sharepoint, PPMC, SAP, Project Wise,
Prolog, MS Office (Visio, Excel, Access, PowerPoint, and Outlook), Oracle
EBS, basic knowledge of Publisher and MYSYS, Internet proficiency.
· Three ( 3) full Primavera Implementation Iterations [From
Primavera Installation (Oracle DBA, Customizations and API) , Process
Development (Cadence Structures, Common Terminology, Artifact Creation) , P6
Structure (EPS, OBS, Security), Training and Governance Data Integrity,
Leadership Development ( Module Competency Design) and Transfer of
administration / P6 Operations : One (1) iteration for P6
V6.2, One (1) P6 V8.1, and in Progress P6 8.2 Version, along with a P6
8.3 Version in a non-project management enterprise setting.
· Developed an Integrated Project Controls Methodology
detailing processes from inception to tracking for Quality Decision
Framework.
· Proficient in Establishing Cost Baseline with WBS for
Earned Value Management tracking.
· 12+ Years establishing resource loaded, critical path
traceable, and cost loaded schedules ranging from
$5 Million USD projects to $1.2
Billion USD programs with 500+ resources.
· Experienced and Trained in Vendor/ Contract Negotiations:
Master Service Agreements, Statements of Work, Purchase Orders.
EDUCATION/ CERTIFICATIONS:
Project Management/ Leadership Skills:
·
Stanford
Graduate School of Business, Advanced Certificate of Project Management
2010 –September 2013 Stanford, CA http://apm.stanford.edu/certificateProgram.htm;
·
Scrum
Alliance, Certified Scrum Product Owner, September 2010- Member 102507
http://www.scrumalliance.org
·
Prosci, Certified
Change Manager, 2014, Portland, OR
·
Center for
Creative Leadership; Looking Glass Experience; August, 2014; San
Diego, CA
·
Center for
Creative Leadership; Coaching for Greater Effectiveness and
Leadership Development Fundamentals; November, 2015; Greensborough, NC;
·
Professional
Project Manager Certification, In Progress- Qualified and Scheduled Test –
Scheduled March 2016; PMP Member 1133493
Negotiation Skills:
·
Kellogg
School of Management, Negotiation for Managers, December 2-7 2011,
Chicago, IL
http://www.kellogg.northwestern.edu/execed/Programs/NEG.aspx ;
·
Kellogg
School of Management, Managing Strategic Alliances, September 30-
October 3, 2012, Chicago, IL http://www.kellogg.northwestern.edu/execed/Programs/CMSA.aspx
·
Berkeley
Extension, Mediation and Conflict Management Certification, April
2013, San Francisco, CA
Decision Analysis:
·
Stanford
Graduate School of Business, Strategic Decision and Risk Management Certificate-
Sept 2013
http://strategicdecisions.stanford.edu/courses/strategicPortfolioDecisions.htm
PROFESSIONAL EXPERIENCE
SunPower – Richmond, CA
Sr. Consultant – Scheduler, October 2015-
Present
Rosemond I & II (150 MW) / Boulder I
&II (150 MW)
·
Develop
Demand/ Install timelines for key commodities (Piles, Torque Tubes,
Electrical, PV) and coordinating the with Procurement and Sr. Management for
timing and availability.
·
Develop Key
Milestones through PPA Contracts, Key Install Rates from Contractor
Agreements, and Key Business Development Milestones critical for financial
viability of projects.
·
Cost Load
Schedules weighted by phases in order to feed into QlickView and other
Management Reporting.
·
Establish and
Track Weekly Grading, Piles, Mechanical Torque Tubes and Trackers, DC
Collection, and weekly Inverters Production Reports.
·
Integrate
Last Planner (6 weeks Look Ahead) Lean Methodology with P6. Utilize Last
Planner for tactical field direction and P6 for Organization integration with
Business Development, Procurement, Project Management, and Sub-Contractors/
Vendors.
Technologies: MS Office, MS
Outlook, MS Visio Pro 2010, Excel w/ Pivot Tables, Primavera P6, MS
Visio 2010, Adobe Acrobat, SharePoint, QulickView, E-Builder
Memphis Light, Gas, and Water (MLGW)-
Memphis, TN
Sr. Consultant Lead/ P6 Functional Lead,
December 2014 – September 2015
Project Inspire- EAM Implementation
Team Lead-
·
Integrated
Milestone priorities to include defects testing, functional design, technical
functionality, UAT Testing, and other solutions as key accountability
resource.
·
Attended
Leads Meeting, submitted weekly status reports, communication plan, and
attended other management meetings as the Team Lead.
·
Gathered SME
requirements for P6 Functionality and Integration into EAM for an Enterprise
P6 Solution.
·
Coordinated
Development and Technical work with India resources to align to key Onsite
Client Milestones, providing context guidance, usability requests, and data
mapping to the India team.
·
Coordinated
and Established Status of Instances for four (4) P6 Environments shifting
from Mock Conversions, Testing, UAT, and Production through a conversion
process of 30K+ Work Orders (Projects) to 200K+ Work Orders in Production/ Go
Live.
P6 Functional Design
·
Established
key structure (WBS) for MLGW Operations Work Orders (basic project unit of
work) that included initial General Comments pass; Parent Work Order
Section based on a logically tied activities, Global and Project Activity
codes included, and resource loaded schedule template; and a Child Work Order
section for resource allocation of crews grouped by Construction Point.
·
Developed and
Implemented P6 Global and Project Security Profiles, established UDFs,
Activity Codes for 500+ Users in Active Directory (450 users PPM/ 60+ Users
Client)..
·
Developed
views, reports, dashboards in both EPPM Web and Client, through Citrix, for
resource allocation of field crews along with interaction of key EAM interfaces
to Update P6 Provide Activities to P6 Work Orders (Projects), resource/ role
allocation of activities and hours.
·
Developed
Play Book and Tutorial on Resource allocation specific to MLGW current MSS
reports and process with Industry Standards for resource allocation for
Construction / Utilities.
·
Updated 225+
Project Templates with back end logic for Milestone triggers to update EAM
(Interface 113) working with MLGW SMEs to identify activities linking to
Finish Milestones.
·
Updated 225+
Project Templates with back end logic tied to Start Milestones to trigger the
Customer Service Center Legacy Software (CIS).
·
Lead in E2E
testing of the Enterprise System in UAT Testing with Client lead testing
scenarios.
·
Converted
30K+ Work Orders into their Testing Environment and 10K+ into CRP4 Testing
Environment for E2E Testing.
·
Uploaded and
Integrated Legacy System’s (MSS) resource and roles tables with resource
codes to include Performance Areas, Crew Type, Departments, Areas.
Technologies: MS Office, MS
Outlook, Excel w/ Pivot Tables, Primavera 8.3 EPPM & Client, MS Visio
2010, Adobe Acrobat, SharePoint, Novell.
Chevron- San Ramon, CA
Sr. Consultant- Project Controller- April
2013- December 2014
WebEx Global Deployment ( 23K End Users)
($10 MM)
Team Lead-
·
Worked with
the Project Manager bi-weekly to maintain and track project management
processes, templates, roles and responsibilities.
·
Tracked and
coordinated weekly and monthly work in the scheduling assuring each resource
had activities attached to their resource allocation assuring efficiency of
budget allocation.
·
Had weekly
one on one sessions with Team Leads and Bi-weekly meetings with external
dependencies (projects, PMO, Procurement etc.) to maintain connectivity to
ITC processes and procedures and to validate % allocation of internal
resources with Resource Managers.
Budget / Cost Allocation-
·
Develop Class
2 (25% Contingency) Project Budget for 2013 and 2014 Years, segregating OPEX
Secondary (internal) vs. Primary costs, and Capital Expenses.
·
Develop
Capital Purchase Timelines for 2013 and 2014 as well as Capital Labor Costs
for budget requests (AR) to be reviewed by Project Manager and Decision
Executive of Project.
·
Develop and
Maintain Total Cost of Ownership of WebEx (Tracking monthly charges of
Circuits, Maintenance of Equipment, Ports and License Costs, etc.) and
translating the Chevron Business Unit’s Cost Distribution.
·
Provide key
budget updates for 2013 and 2014 for Decision Review Board, Decision
Executive, and other external stakeholders to include Earned Value (EVM) burn
charts, Approved budget vs. Forecast, and Budget assumptions.
·
Develop and
establish an Excel Cost Estimate report from SAP encompassing costs by
Phases, Financial Year, Type of Cost ( Primary OPEX Labor/ Non Labor, Secondary
OPEX, Capital Labor / Non Labor), breakdown of amortized costs from initial
payment to final cost, Equipment purchases, and other needed segregation/
quantification of costs.
Resource Management-
·
Develop
Resource Load Curves in FTEs ( Headcount ), Effort (Hours) and Cost for
Quarterly Portfolio Alignment.
·
Based on
functional activities resource labor costs and percentages were identified as
Secondary OPEX (internal), Primary (Contractors/ Consultants/ Expenses), and
Capital costs ( Internal resources and contractors effecting long term
depreciated equipment)
·
Updated and
kept resource rate costs for both internal blended rates and actual
contractor invoice rates.
Schedule Development and Execution-
·
Developed a
baseline project plan that aligns to the budget for resource hours and costs,
takes into consideration resource calendars, resource max usage, cost
constraints by year and cost type.
·
Developed a
duration based CPM Schedule in MS Project 2010 with minimal constraints, predecessor/
successor tied, and traceable critical path.
·
Drive key
high level milestones to completion by coordinating with team leads, key
resources, etc. the progress and delivery of key tangible deliverables.
Change Management and Close Out –
·
Develop,
maintain, and track Deployment and Post Deployment list up to 95% Adoption of
WebEx.
·
Conducted
daily stand up and weekly close out Deployment List Meetings assuring user
adoption in place and Global support in place.
·
Developed
from beginning of project and tracked to the Operations turn over Stake
Holder Analysis.
Technologies: MS Office, MS
Outlook, Excel w/ Pivot Tables, MS Project 2010, MS Visio 2010, AT&T
Connect, MS Lync, Adobe Acrobat, SharePoint.
Wells Fargo – San Francisco, CA
Sr. Consultant- Sr. Project Manager-
January 2013 to April 2013
Resource Capacity
·
Maintain and
update Project Lifecycle status through weekly change requests (CRs) and Late
Requests ( LREs) for Deployment. Track project timelines, updating gating
process statuses, and change requests.
·
Prepare and
run weekly team PES Resource Capacity Meeting reviewing monthly reporting
requirements, resource needs (SOW and Contractors) to include onshore ( SF,
Charlotte) and offshore ( India) .
·
Maintain /
Manage Cost Budget for PES group to align with the PMO reporting on a monthly
basis.
·
Provided
variance reports from estimate forecasts to actuals by project, by
resource, by platform to be reviewed by the managers on a monthly basis..
Technologies: MS Office, MS
Outlook, Excel w/ Pivot Tables, MS Project 2010, MS Visio 2010,
Union Pacific, Omaha, NE
Sr. Project Manager- P6 Implementation-
March 2012 to December 2012
Positive Train Controls and CADx –
($1.2 Billion)
Team Lead-
·
Team Lead for
10+ FTEs onsite and 20+ FTE developers offshore in 3 locations in India,
China, and Philippines.
·
In charge of
developing Project Controls Center of Excellence developing onsite team with
weekly train the trainer sessions.
·
Sr. PM for P6
Implementation program with direct management of $20 MM + Budget over
project.
Master Scheduler-
·
Direct
Oversight over $1.2 BB Budget for Back Office allocation for 500+ FTEs
Onshore / Offshore and Informed and integrating Project Controls Manager for
total $ 2.4 BB Program Budget.
·
Identify
schedule nexus points and key segments within the program plan at a bi-weekly
program meeting.
·
Update
Schedule for bi-weekly VP/ Director Program Meeting. Coordinate with all
integrated departments, function specific groups, and vendors for Field
Qualification.
·
Develop High
Level Scheduling Roadmaps, CADx to Vendor Schedule, Integrate Schedules
towards one High Level Program Schedule and Field Qualification Schedule.
·
Establish
templates for plan stability to include: Software Development Lifecycle
Template, Implementation Templates, Territory Releases, Support and Overhead
templates ( Divided into Quarters)
Governance and Process Development-
·
Provide
program structure through processes: Quarterly Cadence process flow, Project
life cycle definitions, resource onboard/ off boarding life cycle, Activity
Codes structure, Baseline process and life cycle and maintain through hygiene
standards and report reviews with sponsor.
·
Develop
Layout and reports for Governance Hygiene and data validation, reporting and
tracking to include Variance Reports, EVM Tracking (SPI/CPI), Quarterly
Deliveries.
Coaching and Training-
·
Establish a
clear successor framework to transfer functionalities from personal expertise
to existing employees to include: coaching, process development, master
scheduling ( identify, create, manage, and update enterprise logical
relationships.), EVM Cost Analysis, data structure maintenance, life cycles
(SDL, Resource onboarding/ off boarding, reporting cycles, etc.) and decision
frame work establishment and maintenance.
Technologies: MS Office, MS
Outlook, Oracle P6 8.1 Client and Web, MS Project 2003, MS Project 2010, MS
Visio
2010, Lotus Notes, Same Time.
NV Energy, Las Vegas, NV
Sr. Management Consultant/ Sr. Planner-
July 2011 to Mar 2012
Demand Response Program ($35 MM)
· Developed project controls methodology handbook that
established processes for CPM, Resource Loaded, and Cost Loaded (at High
Level WBS) Schedule, processes that lead to that development, and tracking
processes on a weekly basis for both MS Project and Primavera P6.
· Developed Logic Diagrams, Waterfall Schedules in
Primavera, Timelines, and other Visuals for clarification of dependencies for
Go/ No Decisions and Coordination within deployment phases.
Technologies: MS Office, MS Outlook, Oracle P6 7.2, MS Project 2003,
MS Project 2007, MS Visio 2002, Sharepoint
Kiewit IM, Denver, CO
Sr. Planner/ Project Controls- December
2010 to June 2011
SAP Implementation – ($60 MM)
·
Established
Baselines for Equipment Backload and Time Ticket working with Project Manager
and Team Leads (6 Months duration; 1,000 Hrs) and baseline for Work Order and
Fuel Tracking working with Project Manager and Team Leads. (6 Months
duration; 1,000 Hours)
·
Developed
Baseline for Data Center Move from Michigan to Omaha, Nebraska working with
Sr. Manager, Program Manager, and Infrastructure/ SAP Team Leads. ( 1 Year
Duration, 6,000 Hrs., 5 Vendors)
·
Updated
Weekly SLS/ EVM Chart for all assigned projects and reviewed on weekly
project controls meeting. Tracked EVM by Teams through P6 performance %
utilizing coding and layouts.
·
Developed and
updated yearly resource allocation Gantt Chart for 2011 and 2012 upcoming
projects.
Technologies: MS Office, MS
Outlook, Oracle P6 7.2, Oracle P6 8.0 w/ Web Develop, MS Project 2003, MS
Project 2007
w/ Sharepoint.
PG&E, San Francisco, CA
Project Manager / Project Controls-Int-
April 2010 to November 2010
Projects Included: Radio Network
Refresh Program: $65+ MM Telecommunications Upgrade,
GIS Base Program: $69+ MM Asset/
Facility Mapping Software Upgrade,
Condition Based Maintenance Project: $25 +
MM Facilities Maintenance Upgrade
·
Established
key Work Breakdown Structure (WBS) in schedule and integrated into SAP
financials. Established an integrated critical path tied and lead,
resource loaded schedule spanning up to mid 2011 incorporating Gate 1
funding. This process integrated 12 different work streams lead by four (4)
project managers and three (3) vendors.
·
Extracted
monthly labor, expense, vendor invoices, and other internal overhead costs
from
SAP work management and financials
to actualize against the project plan running variance reports.
·
Established
and filtered a template for the construction/ upgrade of 103 sites which
incorporated 75% of the project work effort. Conducted key meetings with the
Sr. Architects and Telecom Engineers to establish accurate work sequences and
tasks for the templates. Worked with the Project Managers and vendors to
establish resources and time constraints to provide Gating Approval and
Budget Accountability.
Technologies: MS Office, MS
Visio, MS Project 2007, Primavera, PPMC, Sharepoint, Genesys, Snagit, Adobe
Acrobat.
HNTB, Oakland, CA
Project Manager/Program Manager – CPM-
September 2009 to March 2010
Projects Included: San Bruno Grading
Project, Kamehameha Design Build Project, and Fairfield / Vacaville Train
Station.
· Establish resource loaded baseline schedule from Cost
Loading Spreadsheet including P6 financial periods.
·
Establish EVM
Template inserting Earning Values, matching cost codes to task lines, and
Matching
EVM to monthly billing providing monthly updates. Ran Monthly EVM Reports for
Upper Management.
·
Establish IFB
Construction Schedule from project Staging Plans in Primavera.
Technologies: MS Project 2003
& 2007, Primavera 6, Primavera 3.0, Schedule Analyzer Pro, MS Office,
HNTB
Earned Value Management Tool, Bridgit,
Project Wise.
Blue
Shield of California, San Francisco, CA
Project Controls Manager, Shield Advance Program- Feb
-August 2009 ($500 MM)
· Identify issues and risks based on schedule updates with
team leads, issues arising from team meetings and project and program-wide
meetings.
· Developed 25+ Baselines working with Engineering,
Development, Finance and multiple stakeholders to establish key dependencies
and resource management. Track, identify and reconcile -Give- and -Gets-
changes from external stakeholders, other program projects and as a result of
program scope changes.
· Maintain requirements traceability matrix, change orders,
and resource leveling for plan validation.
Technologies: MS Project 2007
Enterprise, MS SharePoint (PWA), MS Word 2007, MS Excel 2007, MS PowerPoint,
MS
Visio.
Orcas Project Controls, Jenner, CA
Project Manager, Arizona Casino Hotel, Phoenix, AZ- Jun
2008-Jan 2009 ($45 MM)
· Translated construction drawings and specification into a
$20M Mechanical, Electrical and Plumbing (MEP) project schedule baseline as
part of a $200M, 15 Level Hotel Casino Project, utilizing Primavera 6.
· Interacted with Mechanical, Plumbing, Piping and Electrical
superintendents, project managers and CAD technicians to establish system
templates, task durations, relationships, resource leveling and area work
sequences leading to a baseline for a two level conference center and casino
hotel.
Technologies: Primavera 6.0, MS
Excel 2003, Go To Meeting, MS Visio 2000
Blue Shield of California, San Francisco,
CA
Project Manager, Claims Logic Expansion Project- August
2007-Jun 2008 ($15 MM)
Technologies: MS Project 2003
& 2007 Enterprise, MS Excel 2003, MS Access 2003 (Functional/Requirement
Specification Gathering,) SQUISH [*a
proprietary online database used to record Roadmap, Issues, Risks, etc.], MS
Word 2003, MS Outlook 2003, MS PowerPoint 2003, MS Visio 2000, MS Sharepoint.
Gilbane Building Company, Cupertino, CA
Project Coordinator, Measure E/C Bond Program- Aug
2006-July 2007 ($200 MM)
Technologies: Prolog, MS Project
2007 [High Level Reporting], MS Excel 2003, MS Word 2003, MS Access 2003
[Punch List Tracking], Primavera 3.0
[Project Level Maintenance], MS Outlook 2003, MS PowerPoint 2003.
Blue Shield of California, San Francisco,
CA
Project Coordinator- Jan 2006 - Jun 2006
Technologies: MS Project 2003, MS
Word 2003, MS PowerPoint 2003, MS Outlook 2003, MS Excel 2003.
Pathways, Sunnyvale, CA -Feb-Dec 2005.
Team Coordinator
Davis Reed Construction, East Palo Alto,
CA- Jul-Oct 2004 ($65 MM)
Administrative Assistant, Four Seasons Hotel
Technologies: Prolog, MS Excel
2000, Primavera 3.0
Turner Construction, Sunnyvale, CA- Oct
2003-Apr 2004 ($65 MM)
Project Coordinator, Applied Materials Clean Room
Technologies: MS Access 2003
[Punch List Tracking], MS Project 2000, Prolog, MS Word 2003, MS Excel 2003
and MS Sharepoint.
Peck/Jones Construction, San Francisco, CA
- May 2001-Sep 2002 ($100 MM)
Project Engineer/ Project Manager, SFO
Fuels Project
Technologies: MS Access 2000
[Punch list tracking], MS Word 2000, MS Excel 2000, MS Visio 2000, Prolog, MS
Project [High Level Reporting], Primavera [Project Maintenance], MS Power
Point 2000.
U.S. Army, 82nd Airborne
Paratrooper, Fort Bragg, NC 1999 –2001